Schnelsen Tunnel

A-7 cover passes fire protection test.
The first tube is due to be opened to traffic in summer 2018

The Schnelsen tunnel is part of the A7 motorway cover in Hamburg and will serve in the future as noise protection for local residents in Schnelsen. On Saturday, the 17.03.2018, the fire test for the first tube of the tunnel in Hamburg took place after several weeks of commissioning. Thanks to INSOFT's contribution to the control and instrumentation technology, the fire test was carried out successfully.

INSOFT is also involved in the construction of the Schnelsen tunnel::

  • Preparation of the new HATMS (Highways Agency Technology Management System) tunnel control system
  • Preparation of the H-PLC control software
  • Integration of all functions into the SPS/PLC system
  • Utilisation of modern Windows 10, Windows 2016 Server, operating systems
  • Eplan P8 hardware planning and electrical switchgear construction
Elektroden
Elektroden
Elektroden
Elektroden

Expertise for your project!
Achieving goals together.