Insoft
Complete solutions for tunnel equipment, traffic engineering, control cabinet construction, and software from construction sites to traffic control centers.
Comprehensive solutions for pump stations, snowmaking, cable cars, control cabinet construction, and cross-manufacturer software solutions.
Custom solutions for water supply and flood protection from building sites to mobile operation and alerting.
State-of-the-art automation solutions from hardware planning and control cabinet construction to assembly and finished software solutions.
Services
Software development
Hardware planning
We create circuit diagrams according to the latest standards (e.g. EN 61439-1)
Plant engineering
We build control cabinets ranging from the smallest installation junction board to PLC control and server cabinets right up to low-voltage main distribution boards (up to 6300A).
Assembly
We take over the installing, assembling and connecting of automation systems at your location, manufactured for you in our facilities.
Tirolnet
Wir sind Vor-Ort-Partner zur Errichtung von Glasfaser-Internetanschlüssen in den Gemeinden Vomp, Gnadenwald, Terfens, Kolsass, Kolsassberg und Pill.
Plant testing
Software development
Wir planen und erstellen SPS-, PLS-, Archivierungs- oder Protokollierungssoftware auf Basis neuester Technologien.
Hardware planning
Plant engineering
We build control cabinets ranging from the smallest installation junction board to PLC control and server cabinets right up to low-voltage main distribution boards (up to 6300A).
Assembly
Tirolnet
Wir sind Vor-Ort-Partner zur Errichtung von Glasfaser-Internetanschlüssen in den Gemeinden Vomp, Gnadenwald, Terfens, Kolsass, Kolsassberg und Pill.
Plant testing
AUTOMATION | WORLD OF AUTOMATION | WORLD OF
Projects
Expertise for your project!
Achieving goals together.
Who we are
Neuigkeiten
The road was opened to traffic after general refurbishment and safety upgrades on 09.06.2016. The St. Niklas tunnel is now at the highest safety-related level.
Safety along the road and in the tunnel is our priority. Modern tunnel process control system and modernisation of the lighting system.
A-7 cover passes fire protection test. The first tube is due to be opened to traffic in summer 2018.
Vehicles have been rolling through the east tube of the Stellingen tunnel in Hamburg since the 9th of December 2018.
The data transmission equipment and data processing system for recording and archiving operating data from the water supply system and the drinking water...
Migration of the existing WinCC OA project (called HELiS) from version 3.16 to version 3.19.
Alle News
Our partners
Strong partner companies are essential for us to be able to offer a high-quality product range for our complete solutions.